Main phases of repair in the house

Main phases of repair in the apartment.

How to begin repair of the apartment?

image

The first stage of the repair work of old houses is the destruction and dismantling first of all of the read these plumbing tips shabby walls and partition walls, removing the wall and ceiling covering. This stage is one of the most "dirty" phases of the repair.

One more amongst the most crucial and "dirty" works is the window block replacement. It is necessary to do this firstly because dirt and dust will be unallowable during following phases and it is prohibited at all to open windows throughout painting and wallpaper works (big drops of the temperature level and wetness are unallowable). After mounting windows and windowsills it is needed to pack them instantly in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to avoid scratches).

The following stage is circuitry. Wiring can be set up in walls or along the floor. Circuitry is made inside the pipes to guarantee electrical security and boost reliability. The pipeline safeguards electrical wiring from external damages and permits to change the wire entirely without breaking walls and floor simply by inserting the new wire instead of the old one.

House Painting follows the wiring. The regular error throughout the simultaneous conducting of such works takes place when workers forget to set out among the cable televisions and home painters have actually already plastered and ravelled the wall. As an outcome, extra works are needed to seal chases after on the completed wall. The locations of the feed switch and wall outlet area and their number must be thought-out beforehand. The plan of power electrical wiring is usually consisted of into the design project.

Later on the system should be all set to service in case of failures. In addition to the circuitries, the telephone cable television and the television cable are laid out. The power cable should not be laid out near the telephone and antenna cables to avoid noise pickup and disturbance. The most strange moment is laying out the television cable. In order to make two (or 3) television set in the home the second cable television is frequently just "strongly soldered" in parallel, so the cable resistance is lowered. As a result, the screen quality is deteriorated, lots of programs can't be gotten and etc. In order to avoid such circumstance it is needed to invite a professional with special equipment. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is performed all at once in all premises, if it is possible. Hold-ups are related to the innovation. Each used layer of the plaster (or filling in ending up) must dry completely before the work will continue.

Works in hygienic plans and the cooking area begin at the same time with house painting. It is much better to satisfy so-called "filthy" works in the top place and at the same time. In accordance with the strategy of the sanitary service technician place welding, wall chasing and pipe run are carried out. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then operates in sanitary arrangements are performed according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and accessories are mounted.

After circuitry, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not set up during this phase in order to save their surface area appearance. The finish puttying of walls is performed all at once. The highly precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that measures moisture of the material.

The following phase is the procedure of fill. Fill can be made with different materials-- from normal masonry cement-sand mix to self-aligning floors. The benefit of the easy mix is its cheapness, the disadvantage is that such mixture is much harder lined up at the level and the last dry time of such fill is 40 days, just then the next phase of the work with floor can be conducted, i.e. the period is too long. Self-leveling self-aligning floorings are a lot more expensive, but more technological. Lining up takes place practically "instantly" i.e. fluid solution of mix is poured out, then it runs and you get the horizontal surface. The final dry time is 15 days i.e. you have substantial time economy. The system "warm flooring" is installed into the fill. If the so-called "damp processes" are inapplicable the technology of the dry aligning (the fill innovation) is used bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are installed. Setup of doors need to take into the account thickness of future floor covering. After setup the door can be removed its hinges and DIY plumbing tips got rid of up until the end of repair work or loaded into polyethylene film to secure from damages. Concurrently ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile should be laid on the absolutely dry overlay.

Finishing of the flooring installing depends on the planned covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.

In premises where surface covering of the flooring is laminated floor covering or parquet hoard, the normal wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned consequence is linked just with such scrambling process when the great quantity of dust is developed. In spite of the reality that excellent flooring grinders are geared up with the vacuum, the enough amount of dust is precipitated on surrounding topics consisting of walls. Dust is very acerbic and is severely washed off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not absorb the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be thought about to be ended up. It is left only to set up the plinths, ornamental aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is essential to note that the series of works was listed in basic and can alter depending on the definite situation-- the variety of rooms in premise, your resources, peculiarities of the construction of the multilevel properties. It is based on common sense and everyone efficient in analysis can separately create such a series.